Gateway 2 review — Meridian Tower E14

Consolidated review report covering all applicable regulation parts. Determination status will be snapshotted at issue. This report is in draft.

DraftLast saved 2 hours ago · 14 pages

Pre-issue checklist

  • All Part C threads closed — 4 / 4 accepted
  • All Part E threads closed — 2 / 2 accepted
  • Part A outstanding — 6 threads still open
  • Part B outstanding — 9 threads still open
  • Part F in review — 2 threads awaiting sign-off

Issue is blocked — 17 threads remain open across Parts A, B, F

Gateway 2 review — Southwark Heights Block C

IssuedIssued 3 days ago · Immutable snapshot

Meridian Tower — part summary

Part AOutstanding
Part BOutstanding
Part CAccepted
Part EAccepted
Part FUnder review
Part LN/A

Report settings

TypeGateway 2 review
SignatoryR. Singh (RBI)
Issued toMeridian Dev. Ltd